Jerry Sarl Engineering

Dry Dock Ship Yard - Maintenance

PROJECT PERIOD

2014

PROJECT SPONSOR

Chantier Naval - Limbe

The Challenge

Jerry Sarl was invited to carryout dry docking maintenance to improve access to crew, engineers and navigation. There were challenges around the installation of hoisting equipment, navigation towers, dredging mechanisms and crew/engineer working harnesses.

The Solution

Jerry Sarl was able to deliver a world-class solution to the client by implementing:

  • Securely and easy-to-manoeuvre hoisting devices
  • Markings to enable navigation into dry dock
  • Fast and effective dredging pumps
  • Secure office and working facilities for engineers and crews

All these was delivered within strict international standards to off-shore health and safety rules and standards.

Project Images

About

Incorporated in 2008

Company Registration:

DLA/2008/B/265

Tax Payer Number:

M010800023908S

Contact


Boulevard de la Liberté

Akwa

BP 13261 - Douala


Copyrights © 2022. Jerry Sarl. All Rights Reserved.